Wuhu Hengxin New Material Technology Co., Ltd
Contact:Mr Dai
Phone: 13955309088
Address: 13955309088@163.com
Address: Yinfeng Industrial Park, North Side of Weiyi Road, Wanchun Street, Economic and Technological Development Zone, Wuhu City, Anhui Province
Precautions for installation and use of electric heat tracing tape

1.安装前:
防锈防腐涂层要干透、管道上无毛刺和利角,电伴热带表面无破损,电热带绝缘电阻应≥20MΩ(1 000VDC )。不要强力拉扯电热带,避免脚踏或重物放置电伴热带上;电伴热带与所有配件的型号应与设计要求一致。
2.安装中:
每隔约50cm将电热带用玻璃纤维压敏胶带或铝胶带固定在干管道上,平时尽可能将电热带附在管道下45°侧方;在线路的一供电点和尾端各预留lm长的电热带;在所有散热体如支架、阀门、法兰等处应预留一定长度电热带,以便随时拆除、维修、更换等:在使用二通或三通配件处电热带各端应预留40cm长,多根电热带应注意合理选择电源点,要便于维修。保温层材料必须干燥,应加防水外罩,在保温层外加警示标签注明“内有电热带”。
3.安装后的检查及测试:
检查电热带表面是否损坏,用摇表2 500VDC测试每一独立线路一端,绝缘电阻应在20Mn以上。应保证电源部分过载保护、漏电保护和防爆安全装置良好。
Prev: Introduction to the installation sequence of electric heating belt construction specifications
Next: Precautions for installation of underfloor heating cables
Related News
- Briefly introduce the selection of explosion-proof electric heating belts
- What are the characteristics of explosion-proof electric heating belts
- What are the differences in performance between self limiting electric heating belts and constant po
- The importance of roof snow melting cables
- Can the electric heating belt thaw if the heating pipe freezes?
- Are there any requirements for using electric heat tracing tape in industrial chemical materials
- The role of electric heat tracing in construction engineering
- Sharing safety experience on electric heating belt fire incidents
- Warm prompt from the manufacturer: pay attention to check the electric heat tracing system in rainst
- Analysis of the causes of damage to the electric heating insulation system


